Post Construction Cleaning
Post construction cleaning is the work that turns a finished build into a space you can hand over. Final Phase runs it in three phases that follow your schedule: a rough clean while trades are still working, a detailed final clean before the walkthrough, and a touch-up clean right before move-in, closing or opening day.

| Phases | Rough, final and touch-up |
|---|---|
| Projects | Homes, commercial, renovations, TIs |
| Scheduling | 7 days a week, around your trades |
| Supplies | We bring every supply and tool |
What post construction cleaning actually involves
Post construction cleaning is the specialized cleaning that happens after construction or renovation work, and it is a different job from regular janitorial service. A build leaves fine drywall dust in every vent and on every ledge, paint and adhesive on floors and glass, protective film and stickers on fixtures, and packaging and scrap in every room.
A builder-grade clean removes all of it in the right order, top to bottom and back to front, without scratching new finishes. Final Phase does this work in phases that line up with your build schedule, so nothing gets cleaned twice and nothing gets missed.
People call it construction clean up, the builder clean or after construction cleaning. Whatever the name, the goal is the same: a space that passes the walkthrough and is ready for the owner, the tenant or the buyer. Post construction cleaners also work differently from a janitorial crew. They arrive while trades are still on site, work around inspections, and take direction from a superintendent rather than an office manager.
The three phases of a post construction clean
Each phase has its own timing, its own scope and its own handoff. Open any phase for the full breakdown.
| Phase | When it happens | Who is still on site | What it covers |
|---|---|---|---|
| Rough phase | After drywall and texture, before paint and finish trades | Paint, flooring, cabinet, plumbing and electrical trades | Scrap, packaging and the heavy layer of dust, so the next trades work in a clear space
|
| Final phase | After the last trade leaves, before the owner or inspector walkthrough | The superintendent and the walkthrough team; trades have moved out | Every surface detailed from ceiling to floor so the space looks finished
|
| Touch-up phase | After punch-list repairs and deliveries, right before move-in, closing or opening | Punch-list crews finishing, then the sales team, tenant or store staff arriving | A light pass for fresh dust, fingerprints and footprints
|
Why a construction clean is not a janitorial clean

Janitorial work maintains a space that is already finished. Construction cleaning finishes it. The soils are different, the tools are different, and the order of work matters far more, because dust that settles on a freshly cleaned shelf has to be cleaned again.
Final Phase brings every supply and piece of equipment, so you do not stage anything for the crew. When a building moves from construction into daily use, our commercial cleaning services and recurring janitorial schedules pick up where the builder clean ends.
- Fine drywall dust that hides in vents, tracks and door frames
- Paint, caulk, mud and adhesive on glass, floors and fixtures
- New finishes that scratch if the wrong tool or chemical touches them
- A walkthrough date that does not move, even when the schedule does
What a full post construction clean covers
This is the scope of a complete clean across all phases. The post construction cleaning checklist breaks it down room by room if you want to hand it to a superintendent or a client.
Floors
- Sweep, vacuum and damp mop every hard floor
- Scrape paint, drywall mud and adhesive from floor surfaces
- Vacuum new carpet with HEPA filtration
- Detail baseboards, thresholds and corners
Windows and glass
- Remove stickers, labels, tape and film
- Clean interior glass and mirrors streak-free
- Clean tracks, frames and sills
- Polish glass doors and partitions
Kitchens and break rooms
- Cabinets and drawers inside and out
- Countertops cleaned and residue removed
- Appliances wiped inside and out, protective film removed
- Sinks and faucets cleaned and polished
Restrooms
- Toilets, sinks, tubs and showers cleaned
- Tile surfaces and glass enclosures wiped clear of residue
- Mirrors and fixtures polished
- Partitions and accessories wiped
Air and ceilings
- Vent covers, returns and diffusers
- Ceiling fans and light fixtures
- High ledges and tops of door frames
- Corners and cobwebs
Walls, trim and doors
- Spot clean scuffs and marks
- Doors, frames and hardware wiped
- Switch plates and outlets dusted
- Railings and trim detailed
Tell us the square footage, the phase and your deadline. We send a clear written bid, usually after a quick walkthrough.
Project types we clean
The phases stay the same. The property type changes who signs off, what finishes need protecting and when the final deadline lands.
New homes
Builder-ready homes for closings and buyer walkthroughs, from production communities to custom builds.
Learn moreCommercial buildings
Offices, retail centers, restaurants and medical suites cleaned for the inspection and the opening.
Learn moreModel homes
Showing-ready models that carry the sales of the rest of the community.
Learn moreTenant improvements
Suite build-outs cleaned between the last trade and the new tenant's first day.
Learn moreRenovations and remodels
Kitchens, baths and whole-space remodels cleaned without carrying dust into the rooms you kept.
Learn moreHow a project runs from bid to sign-off
The same four steps apply whether the job is one suite or a full building. The Final Phase process page covers each one in more detail.
Walkthrough and bid
Send the plans or walk the site with us. We look at square footage, finishes, phase and timeline, then send a clear written bid.
Schedule around your trades
We book rough, final and touch-up cleans where your schedule needs them, including evenings and weekends.
Clean to the checklist
The crew works room by room, top to bottom, against a checklist you can see.
Sign-off walkthrough
We walk the space with you and close every item before we call the phase done.
Construction cleaning services built around the build schedule
General contractors and home builders judge a cleaning company on one thing: whether the schedule held. That is how we plan every phase. Our pages for general contractors and home builders cover what each of them needs from the crew.
The last impression is the clean
Months of work get judged in the first minutes of a walkthrough, so the clean is planned like a trade, not an afterthought.
One company, every phase
Rough, final and touch-up cleans come from the same company, so nothing falls between visits and the handoffs are already understood.
Seven days a week
Hours vary by job, early or late, so inspections and closings do not slip because of the cleaning window.
Fully equipped
Final Phase brings the supplies, vacuums, scrubbers and tools. Nothing needs to be staged or supplied by the site.
Scope, schedule and where we work
Every bid is based on square footage, phase, finishes, access and timeline. The pricing guide explains what moves a bid up or down, and you can request a bid with plans or after a site visit.
Final Phase serves the Las Vegas valley, with local pages for Las Vegas, Henderson, Summerlin, North Las Vegas and Boulder City.
Service areas
Post Construction Cleaning across the Las Vegas valley. Pick your city for local details.
Post Construction Cleaning questions
What is post construction cleaning?
Post construction cleaning is the cleaning done after construction or renovation work. It removes drywall dust, debris, protective film, stickers, paint and adhesive residue from every surface, and it is usually done in rough, final and touch-up phases.
What do construction cleaning services include?
Construction cleaning services cover floors, glass, kitchens, restrooms, vents and ceilings, walls, trim and doors, plus removal of dust, scrap and packaging inside the space. The exact scope depends on the phase, so a rough clean and a final clean list different tasks.
When should I schedule post construction cleaning?
Schedule the rough clean once drywall is finished, the final clean once the last trade is out, and a touch-up right before move-in or opening. Send us the build schedule and we will plan all three around it.
How do the three phases differ?
The first phase clears debris and heavy dust mid-build so trades can keep working. The second happens after every trade is finished and details each surface for the walkthrough. The third is a light pass after punch-list work and deliveries.
Does the crew haul away construction waste?
Final Phase clears dust, scrap, packaging and small debris inside the space. Large dumpster loads and bulk waste are handled by your hauler or general contractor, and we work with their pickup schedule.
Do you clean new homes as well as commercial buildings?
Yes. We clean new homes and model homes for builders, as well as commercial builds, tenant improvements and renovations. The scope and sign-off differ for each, which is why each has its own page.
How is a construction cleaning job priced and how long does it take?
Every bid is based on square footage, phase, finishes, access and timeline, and the written bid includes a timeline. Request a bid and we will send it in writing. The pricing guide explains what affects the numbers.
Do you bring your own supplies and equipment?
Yes. Final Phase brings every cleaning supply and tool the job needs, including vacuums and floor machines, so the site does not need to stage anything.








