Skip to content
Serving Las Vegas, Henderson, Summerlin, North Las Vegas and Boulder CityOpen 7 days, scheduled around your trades (928) 303-5163

New Construction Cleaning for Builders and Buyers

New construction cleaning gets a freshly built home ready for the buyer. Final Phase cleans new homes from the first dusty pass after drywall to the last wipe before the closing walkthrough, so the person getting the keys sees a house and not a job site.

Row of new two-story homes in a master-planned community at golden hour
At a glance
PropertyProduction, semi-custom and custom homes
StakeholdersBuilder, superintendent, buyer
Sign-offBuyer walkthrough and closing
PhasesRough, final and touch-up

What new construction cleaning covers on a home

A new home has never been lived in, but it is not clean. Every room carries drywall dust, paint overspray, adhesive from flooring, labels on windows and appliances, and packaging from cabinets and fixtures. The buyer expects the opposite: a house that feels untouched.

New construction cleaning is the work that closes that gap. It follows the build, phase by phase, and it is part of our wider post construction cleaning service. Final Phase handles homes in a builder's community as well as one-off custom builds, using the same three phases scaled to the house.

The sign-off moment is the closing. Everything about the schedule works backward from the day the buyer receives the keys, and the cleaning is one of the last items to finish before it.

Commercial and tenant spaces have a different sign-off and different finishes, which is why they sit on their own pages, such as commercial construction cleaning. This page is about the home.

New build cleaning from drywall to closing

New build cleaning follows the house through three visits, each one lined up with a point in the construction schedule.

  1. After drywall: rough clean

    Scrap, packaging and heavy dust are cleared so painters, flooring crews and cabinet installers can work in a clear house. See rough construction cleaning.

  2. After the last trade: final clean

    Every cabinet, fixture, window and floor is detailed by hand before the builder's own inspection. See final construction cleaning.

  3. Before closing: touch-up

    After punch-list repairs and the builder's walkthrough, a light pass removes fresh dust and prints. See touch-up cleaning.

Tell us the square footage, the phase and your deadline. We send a clear written bid, usually after a quick walkthrough.

New home construction cleaning checklist

New home construction cleaning is organized by room, because buyers walk it by room. Here is how the work breaks down in a typical house.

Kitchen

  • Inside and outside of cabinets, drawers and pantry shelves
  • Appliance film removed, then interiors and exteriors wiped
  • Countertops, backsplash edges and sink cleaned of residue
  • Island, bar stool areas and floor edges detailed

Bathrooms

  • Tubs, showers, toilets and vanities cleaned, labels removed
  • Glass shower doors cleaned and checked for streaks
  • Mirrors, towel bars and fixtures polished
  • Exhaust fans and vent covers wiped

Bedrooms and living areas

  • Closet shelving and rods wiped
  • Baseboards, door casings and window trim dusted
  • Ceiling fans and light fixtures cleaned
  • Carpet vacuumed and hard floors cleaned

Garage and entry

  • Garage floor swept and loose construction debris cleared
  • Entry doors, sidelights and thresholds cleaned
  • Utility room shelves and panels dusted
  • Interior door hardware and garage-access door wiped

How builders and superintendents use it

Finished new kitchen with a white island and bar stools, cleaned and ready for a buyer

For a production builder, the value of a clean is consistency. Every home in a phase of the community is handed over to a buyer in the same condition, which lets the superintendent plan closings without padding the schedule for cleaning surprises.

For a custom builder, the value is timing. A custom home is walked by an owner who often has strong opinions, and the clean has to end close to the walkthrough. We work from the date the builder gives us, and our pages for home builders and general contractors explain how we coordinate with site supervisors.

  • One written scope for every home in a phase
  • Visits booked against the closing calendar
  • Access arranged through the superintendent or lockbox code
  • Everything brought by Final Phase, from vacuums to cloths

How the work shifts by type of home

The checklist is the same. What changes is how the schedule and the finishes shape the visit.

Home typeSchedule pressureWhere the clean focuses
Production homesMany closings in a rolling calendarRepeatable scope per floor plan, fast turn between visits
Semi-custom homesFixed buyer dates with some change ordersUpgraded finishes: stone counters, tile, glass, hardwood
Custom homesOne walkthrough with an owner who reviews every roomDetail on specialty finishes, large glass and built-ins

What the buyer notices, and what we do about it

Buyers tend to open cabinets, look into corners of showers and run a hand along window sills. A new home cleaning pass that only covers the floors and counters will miss exactly the places they check, so the checklist is built around those spots.

Windows are one of them. Stickers, tape and paint overspray on new glass are visible from every room, so we handle them as part of the clean and have a separate page on construction window cleaning. Fine dust from sanding is another, covered under construction dust and debris removal.

A new house cleaning job ends with a walkthrough against the checklist, so the builder's representative can see each room closed out. If you want an estimate, the pricing guide explains what drives it, and you can request a bid for a single home or a whole phase of a community.

Service areas

New Construction Cleaning across the Las Vegas valley. Pick your city for local details.

New Construction Cleaning questions

What is new construction cleaning?

New construction cleaning is the cleaning of a newly built home or building before it is occupied. It removes dust, debris, labels, film and residue left by the construction trades, usually in rough, final and touch-up phases.

What does new home construction cleaning include?

New home construction cleaning includes cabinets, countertops, bathrooms, glass, floors, vents, trim and the garage, plus removal of stickers, tape and protective film. The scope is organized room by room so the builder can check it.

When should a builder schedule new build cleaning?

A builder usually books a rough clean after drywall, a final clean after the last trade, and a touch-up before the buyer walkthrough or closing. We plan the three visits against the closing date.

Do you clean homes before the buyer walkthrough?

Yes. The final clean is timed to finish before the builder's own inspection, and a touch-up lands as close to the buyer walkthrough as the schedule allows.

Can you clean several homes in a community on a rolling schedule?

Yes. We work from the builder's closing calendar and book visits home by home or by block, with the same written scope for each floor plan.

What happens if a buyer finds dust after the cleaning is done?

Dust that appears after the final clean usually comes from punch-list repairs or from adjusting a door or cabinet. That is what the touch-up visit is for, and we place it as late in the schedule as the builder allows.

Can new construction cleaning cover townhomes and condos?

Yes. Attached homes are cleaned with the same phases and room checklist, with extra attention to shared walls, stair runs and entry points that see heavy trade traffic.

Do I need to provide water, power or supplies?

We need utilities on in the home for the final clean so sinks, lights and vents can be checked. Final Phase brings all cleaning supplies and equipment.

Book the clean before your walkthrough.

Get a free bid (928) 303-5163